My OMG goal is to have them both machine quilted and bound by the end of July, so I don't quit so close to the finish. They are about 45 inches square and started with a giveaway of 92 HSTs left over from a project by Summer at Easy Quilter. I turned them into six inch pinwheels and had enough to make two quilts. The rest of the rows were just added as I had the fabric and thought up some uses, with lots of pinwheels jelly roll strips from stash.
Quilt number One:
Quilt number Two:
I'm making this goal for myself and for Project Linus which will be the recipient of these kids quilts.
I'm so glad you reached your goal! These really deserved a finish. So what's for August? =)
ReplyDelete